Why is Constructionline important?
Constructionline makes supply chain management simple by connecting construction buyers with a vast database of verified suppliers. Constructionline ensures that suppliers meet a range of standards which have been developed by the British Standards Institute (BSI) and approved by the government.
Using standardised pre-qualification questionnaires such as the PAS 91, buyers can easily see whether suppliers meet required specifications, enabling them to quality check supplier information, save money, increase efficiency, and reduce risk.
What is Gold Membership?
Time to celebrate, on the 16th February 2023, Hurley and Davies Ltd handed over the Skatepark to Mumbles Community Council (and in particular Pam Erasmus) with whom we have worked closely to assist in delivering this fantastic addition to the Swansea waterfront!
A huge thanks is extended to Maverick Industries who were the design and build contractor for the project who have been engaging throughout the whole process and demonstrated an exceptional quality for a complex build.
We are very proud of our involvement in this project. Well done to everyone involved!
As project manager, Hurley & Davies Ltd are working alongside the Design and Build Contractor Maverick Industries and the Lottery Commission to bring this fantastic community project to life.
Keep up the good work.
The 5-storey building required substantial scaffolding and the project was F10 notifiable under the Construction (Design and Management) Regulations 2015. The 12-week programme was successfully managed and co-ordinated throughout resulting in a project that was delivered within budget and without issue.
For the building to remain 'business as usual' and disruptions to be minimised, provisions were made for staff and members of the public whilst the works were undertaken. Regularly scheduled site meetings allowed contractors and the client to address potential issues or risks as they became known which ensured clear communications between all stakeholders and enabled smooth project delivery.
Additional items such as corroded louvre doors, stained balcony soffits, and soiled boundary walls were also addressed under the project’s provisional sums and contingencies so that an excellent standard of finish was achieved across the entire external fabric of this impressive building.
The aim of the report is to determine the condition of the building fabric and outline potential remedial waterproofing works.
The report will be utilised to allow the client to make a judgement on the ongoing economic feasibility of utilising the space in question.
The programme is being undertaken using a JCT contract and involves a lime mortar specification to repair areas of defective render.
Other works include refurbishment to the ornate features such as the timber dentils, re-pointing stonework and quoin details, upgrades to cast iron rainwater goods and timber weatherboarding.
Refurbishment work is also being undertaken to the windows and roof.